
Every offshore development begins with one critical requirement: confidence in the data.
For the Green Volt Offshore Wind Farm, Global Maritime managed one of the industry's most comprehensive survey campaigns, supporting the development of a 500 MW floating offshore wind project through procurement, management and delivery of combined 3D UHRS and seabed geophysical surveys.
The objective was clear: achieve full coverage, maintain strict commercial control and deliver high-quality survey data to support future development decisions.
The survey programme involved a high-value vessel spread, demanding seabed conditions and one of the largest survey scopes yet undertaken for a floating offshore wind development.
Success depended on balancing technical performance, commercial management, and operational efficiency throughout the campaign. Accurate forecasting, daily decision-making, and close contractor management were all critical factors.
Global Maritime managed the project from tendering and market engagement through mobilization, offshore support, and final data delivery.
Using its Survey Management Platform and proprietary simulation capabilities, the team maintained visibility of survey progress, costs and project performance throughout execution. This provided the client with real-time control of both technical and commercial aspects of the campaign.
The survey successfully achieved full coverage across the site while meeting required data quality standards.
The campaign was completed on time and within budget, despite challenging early sensor issues. It also deployed the largest 3D UHRS seismic array used in offshore wind to date and demonstrated exceptional accuracy in schedule forecasting.
The result was a high-quality dataset and a strong foundation for the next phase of project development.
Successful offshore wind projects are built on reliable information.
The Green Volt campaign demonstrated how technical expertise, proactive project management and advanced digital tools can work together to strengthen both project outcomes and commercial performance.
This is not business as usual.

Weather-adaptive execution replaced fixed campaign planning. Safe recovery in harsh North Sea conditions.

Integrated offshore ops, logistics and assembly into one campaign. World’s largest floating wind exchange, zero incidents.

Replaced pivot-based method with live offshore replacement. No downtime, no lost LNG exports.